< Previous | Thumbnails | Homepage | Magyarul |

Auxiliary gas turbines

Photo by: Takács Bence
Captured at: 2006:10:26 12:31:29

617 views

Map:
térkép
PicID: 2343
Tags: Mátra Power Plant

As the lignite powered blocks cannot be controlled very finely, and have a startup time of six to eight hours, the power plant has to run at full power which is a major drawback on the market as needs for energy change hecticly during the day. To add some more space to controllng, two, 25 MW gas turbines has been added with generators that have a startup time of twenty minutes.

New albums:

 

Photo by Takács Bence

Copyright 2005-2014. www.benbe.hu. Railway photography gallery of Takács Bence.

About the authors