The 2M62 1202 leaving the bridge of the river Talabor at Bustyaháza (Буштино)
There’s a 200-metre-high difference between the height of the upper section of the Talabor and Tisza’s next affluent, the Ріка, making it an ideal place for a water power station. The Rika-Terablja system has three 9 MW Kaplan-turbines for its generators.
Photo by Takács Bence
Copyright 2005-2024. www.benbe.hu. Railway photography gallery of Takács Bence.