Lillafüred - the end of the current line after the junction to Kerekhegy
Photo by: Takács Bence
Captured at: 2020:10:03 13:33:18
950 views
Originally the Kerekhegy line immediately started climbing after the triangle (wye) and this two-track storage loop was built level. Currently only this loop exists, the line to Kerekhegy was lifted in the eighties. The loop now connects to the triangle and the LÁEV main line with a lot more elaborate track connection.
Photo by Takács Bence
Copyright 2005-2014. www.benbe.hu. Railway photography gallery of Takács Bence.