The CFF Moldovita / Mocanita Hutulca 764 431 Bucovina
seen at Moldovita station, during its preparation for the day at the depot
After the first half of the snowy Transylvanian narrow-gauge raiéway album, here is the second half. This one is mostly of the Moldovita Forestry Railway and partly of the standard-gauge railways in and around Bucovina. The first section of the railway was built between Moldoviţa and Roşoşa, of a ditance of 24 km, of a gauge of 800 mm, by the Austro-Hungarian Monarchy. It had soon been changed to the uniform 760 mm (76 cm) gauge. The greatest length of network, 73 km, was reached in 1987.
Photo by Takács Bence
Copyright 2005-2024. www.benbe.hu. Railway photography gallery of Takács Bence.